This activity is used to view and define the availability of a work task. The
availability for a work task can be inherited from the equipment object on
the the work task. If no availability has been defined for the equipment object
then the availability defined on the location which is connected to the work
task address will decide when the work can be scheduled. Location availabilities
will however never be visible on the work task itself. A work task availability can be set manually according
the requirement and will override both the availability defined on the location
and on the equipment object.
Once a work
task is created for an equipment object, the availability of the
object will be fetched to the work task, based on the work type and the priority
defined on the work task. If the availability for the work task is not defined
or not inherited from the connected equipment object, then the availability of
the location connected with the work task address will be
used for the
work task availability when scheduling the activities for the work task.
As a result of this activity, availability information is set for the work task.
Work Task
Prepare
Work Order
Functional Object
Serial
Object
Location
Work Task
Prepare Work Order
Prepare Work Order/Work Tasks/Scheduling/Work Task Details
Object Availability
Location
Follow the given procedure to define availability of a work task manually: