Serial Order History/Task Cards/Material

[About Historical Data] [About Site Unique Inventory Unit of Measure] [To Perform Maintenance Engineering] [To Prepare Line Maintenance] [To Operate Asset] [To Scope Maintenance Visit] [To Prepare Maintenance Visit] [To Dispatch Asset and Close Maintenance Visit]

Usage

Use this tab to view information on the utilized material (either on the corresponding work task or when performing quick reporting on an event). When the work task or maintenance order is finished, issued material quantities and costs will be transferred and shown in this tab. If there are additional material that have been issued on the work task, this information will also be transferred.  If the work task is reopened and additional changes done on it, e.g., additional material is issued, this information will be transferred back once the task is finished.

In this tab, planned quantities will be shown for material from the task library (task card or subtask). Planned values will not be shown for any additional material that have been issued on the work task. This makes it easier to analyze actual utilization against planned material requirements. The following table describes how material is transferred to the serial order history when the work task or maintenance order is finished:

Action Transferred to Maintenance Order (or Serial Order History)
Material is issued against a transferred material demand (i.e., from the maintenance order) The corresponding material demand line in serial order history will be updated with issued quantity and cost.
A material demand has been added to the work task and issued A new material demand line will be added to the serial order history with issued quantity and cost.
A transferred material demand has been removed from the work task The original material demand line will remain in serial order history with 0 issued quantity and cost.

If the serial's unit of measure (UoM) is different to the UoM of the site at which the work was executed, automatic UoM conversions is performed when a maintenance event (with material demands) is distributed and when issued material is reported back to the event. You can use this tab to view the utilized quantities in accordance with the UoM on the different sites.

Activity Diagram

Perform Reliability Analysis
Plan Line Maintenance Activities
Define Maintenance Visit
Conclude Maintenance Visit
Manage Flight Logs

Activities

Analyze Historical Data