Deferral Definition/Revisions per Item

[About Fault Deferral Rules] [To Manage Maintenance Program]

Usage

Use this tab to define the item codes to be used for the different part revisions. The connection defines the maximum allowed deferral period for a given part revision. If you select an item code with the maximum delay specified in an operational parameter, this operational parameter is required to be defined for the part revision.

If the item code is also listed on the Functions per Item tab, the item code can be used only when the fault is reported with a reference to that function number. 

Activity Diagram

Define Fault Deferral Rules

Activities

Connect Part Revision to an Item Code
Connect a Function to an Item Code