Use this dialog box to connect one or several operations to either an existing or a new operation block. If the operations are planned to be executed in parallel in the work center resource, the Block Resource Share value will indicate how big share of the resource capacity the operations in the block together will utilize.
If characteristics has been connected in the Work Center/Characteristics tab those will be dynamically displayed as columns in the table section. Note that only the 10 first characteristics in the list will be displayed.
Create and handle operation block
Connect operation(s) to operation block
Select operation(s) and create operation block
Forward schedule block operations in parallel
Forward schedule block operations in sequence
Backward schedule block operations in parallel
Backward schedule block operations in sequence