Use this window to study the workload for a specific work center during a specified interval of time. You can also study the workload for different master schedule sets, since these can have different forecasts. In this way, you can see how different forecasts burden the work centers. You can also see the effect of changing capacity by using different capacity scenarios.
For the description of each tab in the window, follow the appropriate link: Load per WC - Details, Work Center Load Chart, Work Center Load Grid, Work Center Scenarios.
Evaluate
RRP Results
Evaluate
RRP Results Using Graph
Define RRP Capacity