This activity is used to export basic data from IFS Applications to Primavera
Project Management (Primavera). Basic data in IFS/Project are calendars and
resources. Both the Calendars and Resources can only be exported. An export of basic data will create new records
in Primavera, or update the information in existing basic data. The
basic data must exist in Primavera before it can be assigned to a project through a project
integration.
Integration configurations are created and saved as records in the
Integration Configuration/Basic Data Integration
tab. They can be reused any number of times to perform a basic data analysis, or to initiate a basic data
integration.
Before the actual export is started it is possible to run a data analysis that
will check the most fundamental differences in business logic between
IFS/Project and Primavera. Executing the data analysis functionality is a
recommended part of the process of integrating data; and it will give
information about data that may need to be rectified before performing the
integration, in order for the integration to be successful. The analysis can be
started separately using the Analyze Data menu option, or in combination
with the integration by using the Analyze Data and Run Integration menu
option. While the analysis is optional, but recommended, the integration can also
be run without it by using the Run Integration menu option.
When initiating a basic data export, the basic data from both IFS/Project and
Primavera is compared in order to find the changes that will occur to the basic
data, should the export be completed. This information is displayed in the
Compare Data dialog box that will open. Thus it is possible to analyze the
consequences of updating the basic data before the actual export. Once the basic
data from IFS/Project and Primavera has been compared, the actual export can be
performed. A completed basic data export, or basic data analysis, results in a
history record.
The details for the basic data export are given in About Integration to Primavera Project Management.
Integration Configuration/Basic Data
Integration
Integration Messages
Compare Data
Integration History
Note: If the basic data analysis results in integration messages of type Error, basic data must be rectified before running the integration. Correct the data accordingly in IFS/Project or Primavera. Continue to the activity Analyze Integration Messages to get more detailed help on how to rectify problems. It is optional to take action on the other types of integration messages, i.e. warnings or information messages.
Notes: