10.6.3.1 Report Operations
10.6.3.2 Report Operations from Shop Floor Workbench
10.6.3.3 Report Operations from Time Clock
10.6.3.4 Report Outside Operations
10.6.3.5 Report Outside Operations from Shop Floor Workbench
10.8.1.1 Receive Disassembled Overhaul Object
10.6.8.1 Maintain Shop Order
Disassembly Shop Order
10.6.2.1 Issue Shop Order Components
10.6.2.2 Issue Shop Order Components from Shop Floor Workbench
10.6.2.3 Issue Shop Order Components using Pick List
10.8.2.1 Automatic Disassembly
7.9.6.1 Handle Shop Order
7.9.6.2 Handle Shop Order Batch and Serial Tracking
7.9.6.3 Handle Shop Order Configuration
7.9.6.4 Handle Shop Order Control Plan
7.9.6.5 Handle Shop Order Material and Operations
7.9.6.6 Handle Shop Order Reports
7.9.6.7 Handle Shop Order Split and Merge
7.9.12.1 Reserve Components
13.11.4.1 Report Production Quality
Off Logs and On Logs