Distribute Maintenance Events
Explanation
This activity is used to distribute pending events.
Pending events can be packaged together to be distributed to a maintenance order.
A package of pending events can only include events for serials within the
structure of the selected top serial. The distribution type, workshop code,
planned start/finish dates and the earliest start and latest finish dates must be
entered before events can be distributed. Valid distribution types are Work
Order, Simplified Work Order and Execution Logic Structure.
The distributed events will be executed at the specified workshop.
If the distribution type is set to Simplified Work Order, the event is
handled in Fleet and Asset Management although transactions
for the event are created automatically in IFS/Work Order Management. These
transaction records can be used when you want to track financial transactions
and record the consumption of material during a process. If code part
information is defined, this information will be retrieved during the process.
If the distribution type is set to Work Order, the event is
handled directly in IFS/Work Order Management. A work order is created on the site to
which the specified workshop belongs. A work task is created for each task card
and subtask on the event and connected resources, material, and sign off
requirements are transferred to the work task. If parts included in the material
list have a different unit of measure (UoM) at the site on which the work
order is created, the system will automatically convert the current material
quantity (displayed in Fleet and Asset Management) into the quantity of the UoM on the site.
The converted material quantity can be viewed in the
Materials tab on the work order. If code part
information is defined on the serial, this information is transferred to the
work task. All financial transactions are retained on the work order.
The Execution Logic Structure
distribution type
is used when the work included on the maintenance order is to be grouped
according to predefined grouping criteria.
When distributing events, it is possible to create the
maintenance order in the Initial Scope Definition status and the
corresponding events in the Planned In Scope status. To do this, select
the Plan Maintenance Order check box. The purpose behind this feature is
to facilitate the planning of a maintenance order. If this check box is not
selected, the maintenance order and all connected events will be created in the
Released status, and corresponding work orders and work tasks will be created
automatically.
If pre-posting is required on the work order, code part
information must have been defined on the serial. Code part information which
consists of the cost center and object will be retrieved from the serial for
which the event is distributed, for the applicable company. This information can
be viewed in the
Pre Posting dialog box. For more information, refer the online
help file
Code Part
Information.
If a modification event leading to a part identity change is to be distributed
and this modification has the Terminating Action execution type, the assigned and/or affected serial will be renamed
automatically once the modification is embodied and will include the new part number and revision. In order to successfully
perform the rename of a serial, the new part number and the revision for the serial
must have been entered on the modification (i.e., in the Change to Part
Number and Change to Part Revision fields). Furthermore, when the
modification event (with the Terminating
Action execution type)
is distributed, the system will perform a check to validate
the following information:
- the new part number is a valid alternate of the
old part number (only valid if the serial that is to be renamed is installed
in a structure)
- the maintenance program and maintenance group for the old part number is
valid for the new part number
- the manufacturer of the old part number is valid
for the new part number (i.e., when a new manufacturer and manufacturer part
number have not been entered)
A warning message is generated when the new part number
is not a valid alternate to the old part number of the serial (when the serial
is installed in a structure), and when the maintenance program and manufacturer
is not valid for the new part number. You are recommended to read through these
messages before continuing with the event distribution.
Note: These validations are also performed when a new part number is entered
for the assigned/affected part and when the modification is activated.
Prerequisites
- Pending events must exist.
- Workshop codes must exist.
- A distribution type, workshop code, planned start/finish, earliest start,
and latest finish dates must be entered on the
event.
- Work types need to be connected to event types. This
will be used when work types are to be entered for each work order that is
to be created.
- All events on an order need to have the same top-level
serial and distribution type, and needs to be distributed to the same workshop.
- If predefined task cards exists for the event code, the resources and material on the task card must be valid at the
maintenance order site. For resources, the site connection is set in the
Resource Detail/Connections/Site tab.
- If automatic pre-posting is required, code part information must have been defined on the
serial or a parent serial in the structure. This is used to retrieve code
part information on a work order distributed from Fleet and Asset
Management.
- To automatically suggest a value in the
Workshop Code field, a default workshop must have been assigned to the
user.
- If a modification event is supposed to result in a part identity change,
the new part number and revision for the serial assigned to and/or affected
by the modification must have been entered. For more information refer the
online help files
Assign Part Revision to Modification and
Enter Affected
Parts.
System Effects
- The maintenance event is distributed to the workshop
responsible for the execution of the work order.
- The event is transformed from a pending event to a planned event or a
running event.
- If the distribution type is set to Work Order and the Plan
Maintenance Order check box is not selected, a work order is created for
each distributed event. A work task is created for each task card and
subtask on the event, and connected resources, material, and sign off
requirements are transferred to the work task.
- If the CREATE_WO_STRUCTURE parameter is set to
TRUE in System Definitions/Object Property or in
Configuration Basic Data/Object Property, the Create WO Structure
check box will be selected automatically when distributing events.
- If the Create WO Structure check
box is selected, a work order equivalent to the maintenance order will be
created in IFS/Work Order Management during event distribution. All work
orders (related to the events) will be automatically connected to this top
work order, i.e., a work order structure will be created in
IFS/Work Order Management.
- It will be possible to create the maintenance
order in the Initial Scope Definition status so as to carry out
detailed planning on the maintenance order.
- If a pending modification event leading to a part identity change exists,
and this modification has the Terminating Action execution type, the new part number,
revision and the manufacturer data on the serial will be validated when the
event
is distributed.
- A warning message is generated when the new part
number is not a valid alternate.
- A warning message is generated when the
maintenance program for the old part number is not valid for the new part
number.
- An error message is generated when the
manufacturer and manufacturer part number is not valid for the new part
number.
- Documents connected to a maintenance event will be
copied to the maintenance order.
- The transferred material quantity is correct in
accordance with the UoM for the serial on the site.
Window
Maintenance Event Distribution
Maintenance Event Distribution for Components
Related Window Descriptions
Maintenance Event
Distribution
Maintenance Event Distribution/Pending Events
Maintenance Event Distribution for Components
Maintenance Event Distribution for Components/Pending Events
Maintenance Order
Prepare Work Order
Maintenance Event Summary
MRO Shop Order
Maintenance Event Basic Data/Workshop Access
Procedure
Use the following procedure to distribute an event from the
Maintenance Event
Distribution window. You can view the top serials of a structure and the
pending events for all the serials connected to the structure in this window:
- Open the Maintenance Event Distribution window.
- Query (F3) for the top serial for which you want to distribute events.
- The distribution type Work Order is displayed
automatically in the Distribution Type field.
Change to a different distribution type if needed.
- If a default workshop is assigned to the current user, the workshop ID
is displayed automatically in the Workshop Code field.
If not, use the List of Values to enter a valid workshop. This will
be the workshop responsible for the execution of the work order.
- If necessary, you can change the default values in
the Planned Start, Planned Finish, Earliest Start and
Latest
Finish fields.
- Select the Auto Include Mx Events check box if the event should be
included automatically on the maintenance order. The event is included
automatically if an event for the same serial has been selected manually.
- Select or clear the Create WO Structure
check box, depending on whether you want to create a top work order
equivalent to the maintenance order. Note: This check box is only applicable for
events of
distribution type Work Order.
- Select the Plan Maintenance Order
check box if you want to create the maintenance order in the Initial
Scope Definition status and all connected events in the Planned In
Scope status.
- Select the Auto Finish Order check box if
you want to automatically finish the maintenance order. If this check box is
selected the status of the maintenance order will be set to Finished
when the last event connected to the order is set to either the Finished
or Cancelled status.
- Click the Pending Events tab.
- Select the Include Mx Event check box, for the event(s)
you want to include in the work order.
- On the selected event(s), you can enter a value
in the Work Type ID field. Use the List
of Values to select a value.
- The Warranty Covered check box is selected
if the pending event is of the Serial Repair type and the fault indicates that
the warranty is covered.
- Save the record (F12).
Use the following procedure to distribute an event from the
Maintenance Event
Distribution for Components window. You can view the pending
events for
uninstalled serials for the selected part number in this field.
- Open the Maintenance Event
Distribution for Components window.
- Query (F3) for the
part number of the disconnected serial for which you want to distribute
events.
- Continue steps 3 to 14 detailed above.