Change DOP Routing Revision and/or Alternate
Explanation
Use this activity to change a routing revision and/or alternate for a DOP
order.
Prerequisites
When the DOP order is released, the status of its
supply shop orders must be Planned, Released or Reserved.
System Effects
As a result of this activity, the routing revision and alternate are
changed on the
DOP order. The Routing Changed check box will be selected on the
DOP Order//Detail
tab. If the DOP order already has a routing revision and an
alternate, the existing routing, work guideline, and tool records are removed
and replaced.
When the DOP order is released, the operations of its
supply shop orders are adjusted.
Window
DOP Header
DOP Order
Related Window Descriptions
DOP Header
DOP Header/Structure
DOP Order
DOP Order/Detail
Modify DOP Routing
Procedure
- Select the DOP order for which the routing revision and/or alternative needs to be changed, either from DOP Order window or the DOP Header/Structure tab.
- Right-click, point to Change DOP Structure/Routing and then click
Change Routing Revision and/or Alternate,
the Modify DOP Routing dialog box appears.
- In the Routing Revision field, use the List option to select which routing revision number you
want to change to. The Routing Alternate field will change based on the
selected routing revision no. For a configurable part, when
you select the Revision No, the configuration evaluation will decide which
alternative is used based on rules.
- Click OK.