Add Work Guideline to DOP Order
Explanation
Use this activity to add work guidelines to a selected DOP component or an operation.
Prerequisites
The DOP component must not be in the Closed or Cancelled status.
System Effects
As a result of this activity, the system adds work guidelines to a DOP component
or an operation. Please note that if you add a work guideline to a released DOP
it will not automatically replicated to the pegged shop order.
Window
DOP Order
DOP Header
Related Window Descriptions
DOP Order
DOP Order/All Lover Levels
DOP Order/Components
DOP Order/Operations
DOP Header/Structure
DOP Header/Structure Multilevel
DOP Component Work Guidelines
DOP Operation Work Guidelines
Select Work Guideline Template
Procedure
- Select the DOP order or header to which you want to add work guidelines.
- Click Work Guideline from the right mouse button options.
- Click to create a new line in the table.
- To use an existing work guideline template, select the new line, right-click,
then click Work Guideline Template. Select a work guideline template,
then click OK.
- To create a work guideline manually, enter information in the Guideline
Desc and Guideline Text fields.
- Select a value in the Guideline Type field. For component work
guidelines valid values are Instruction and Reference. If you
choose Reference, you must enter values for the X Coordinate,
Y Coordinate, Z Coordinate and Reference Qty fields.
For operation work guidelines valid values are Instruction and
Subtask. If you choose Subtask you can select Required to
Close Operation in
the Sign Off Required field to prevent the operation from closing
before the subtask has been signed off. Select Required to Close Shop
Order in the
Inspection Sign Off Required field to prevent the shop order from
closing before the subtask has been signed off.
- Optionally, enter a reference number in the
Reference Number field and use the List of Values to select a reference
type in the Reference Type field.
- If there is a need to validate the employee qualification for the
subtask, you can enter Employee Qualification Profile, then subtask
must have Sign Off Required.
- If there is a need to validate the inspection employee qualification for
the subtask, you can enter Inspection Employee Qualification Profile,
then subtask must have Required to Close Operation or Required to Close Shop
Order.
- Repeat steps 3—9 for each work guideline to be connected to the specific
component or operation.
- Click Save.