This activity is used to calculate costs related to a DOP structure.
The structure and standard cost must be calculated and saved, and copied to cost set one for the parts included in the DOP structure.
As a result of this activity, the selected cost types are calculated for the requested scope.
Calculate DOP Costs
DOP Order
DOP Header
Monitoring Cost Performance
Calculate DOP Costs
DOP Order
DOP Order/Costing
DOP Header
DOP Header/Costing
DOP Header/Performance Monitoring
Monitoring Cost Performance
Monitoring Cost Performance/Performance
Monitoring
You can generate costs for a site/structure either by direct execution (Procedure A) or by scheduling the task to execute as a background job (Procedure B).
Procedure A:
To generate costs for a DOP structure:
To save the standard cost of a configurable part the first time a configuration ID is used for parts defined with the Cost Per Configuration configuration cost method:
To generate costs for a site:
Procedure B:
Click Schedule to open the New Database Task Schedule window. Set the scheduling parameters as desired and save. Scheduled tasks can be seen in Scheduled Database Tasks window.