Enable/Disable Revision Control

Explanation

Use this activity to enable/ disable revision control on an existing PM action, however, it is normally done before a PM action is started.

When Revision Control is ON;

When Revision Control is OFF;

Prerequisites

A PM action revision in Active or Obsolete status should exist in the system.

System Effects

As a result of this activity a journal entry is created in the PM action that the revision control has been enabled/ disabled.

Window

PM Action

Related Window Descriptions

PM Action
Create New Revision for PM

Procedure

  1. Open the PM Action window, and query for the PM action for which you want to enable/ disable the revision control. (Alternatively you can directly query for the revision itself).
  2. Right-click and then click Revision Control.

Note: The "√" next to Revision Control right mouse option indicates that the revision control is enabled on PM action.