Connect Permit Type to Work Task Template
Explanation
Use this activity to connect one or more permit types to a
work task template. Permit types ensure that the maintenance work in the
facility can be performed under safe conditions.
An isolation can also be connected to the permit type.
Isolations describe how a certain part of the facility should be shut down
temporarily, so that the specified work can be carried out under safe
conditions.
Prerequisites
- Permit types, isolation types and a connection between them must be defined in the
Work Order and PM Basic Data
window in IFS/Basic Data
for Maintenance.
- Isolations should be registered in IFS/Equipment.
- The work task template should not be active.
System Effects
As a result of this activity, permit types and
isolations (where applicable) are connected to the work task template.
Window
Work Task
Template
Related Window Descriptions
Work Task Template
Work Task Template/Permit
Procedure
- Open the Work Task Template window, and create a new record or query for an
existing one (F3).
- Click the
Permit tab and create a new
record (F5).
- Enter a value in the Permit Type field. Use the
List of Values to select a suitable value.
- Enter a value in the Isolation ID field. Use
the List of Values to select a suitable value.
- Select the Generate check box if you want a permit to be created
during the work order generation process.
- Save the information (F12).