Use this tab and the associated sub-tabs to view the structure and details of the existing interim orders and supply orders constituting the assembly.
You can see the details of the interim orders for the position parts exposed for maintenance, as well as the multi-level structural relationships of these orders. The graphical structure can be used to see the relationships between repair and assembly interim orders. Each node in the structure represents an interim order. You can also study the supply order data by selecting a node representing a supply order, the right pane displays details for the MRO shop order, i.e. the overview window shop orders.
You can select a repair interim order node, right-click and then click Disconnect from Parent to disconnect repair interim orders from the structure. This may be done because the supply date from the repair will be too late to feed the start date of the subsequent assembly interim order to which it is linked. This action can impact both the schedule and costs associated with the interim order structure.
N/A