Use this window to enter and revise data for work centers. The information that you enter for work centers is used when you work with operations, shop orders, master scheduling, material requirements planning (MRP), resource requirement planning (RRP), and cost estimates. Work centers are used when you enter operations, so they must be entered before operations. The work center is also a resource that can be used, eg., in project planning and maintenance.
Note: If IFS/Purchasing is not installed, then you cannot create outside work centers.
For a description of each tab in the window, follow the appropriate link: Detail, Cost, Resource, WC Capacity, Routings, Routing Templates, Std Operations, Location, Utilization Statistics, Characteristics, Emissions, RRP Capacity, RRP Routings.
BDR for structure/routing
BDR for RRP
BDR for constraint based
scheduling
BDR for shop
floor reporting
Set up object
costing
basic data
BDR for
eco-footprint impact estimation
Create
Work Center
Define Resources
Calculate Work Center Resource Capacity for Manufacturing
Define RRP Unique Work
Centers
Define RRP Capacity
Connect Capacity Scenario
Create a Routing Template
Define Work Center Cost
Copy Work Center from Other
Work Center
Create Setup Matrix
Enter Shop Floor Reporting Basic Data
Define Work Center Emissions