Start Setup
Explanation
This activity is used to register that a set up has started on one or several
operations. It is possible to register both labor and machine time.
The start time and the stop time of a setup will be recorded. The clocking
sequence is a unique number that will be set for each clocking record that is
created, however the same clocking sequence will be set for all operations that
are started together if the Concurrent Operations value in the Work Center
window is set to group start operations in sequence.
Operations connected to an operation block is expected
to be started together. You are still allowed to start them individually, but a
warning will be given.
From time clock, you can start setup for only one
operation at a time.
Prerequisites
- The status of the operation is not Planned or Closed.
- The status of the shop order should not be Parked.
- Neither a production nor set up activity is already running for the
particular operation.
- To start labor time, a labor class must be connected to the operation in
the Shop Order window.
- To start machine time, a valid resource must exist on the work center.
- If Reporting Mode has been set to Employee Reporting on
the used site at least one Employee must be entered in order to
report labor time.
- If an employee setup qualification requirement
exists for the operation, and the qualification check for the site is
mandatory, then the reporting employee(s) must have those qualifications.
- To report from time clock, employee should be a
time clock user. When reporting as a team, all the employees in the team
should be time clock users.
- If the employee has a valid work schedule for time and attendance
reporting, the employee must be clocked in for the day.
System Effects
- If the Machine Time check box has been selected, a Machine
Clocking will be created and the start time recorded on it.
- If the Labor Time check box has been selected, one Labor
Clocking will be created for each Employee that has been entered in the
Employee List and the start time will be recorded on it. If no
Employee is entered, one clocking will be created.
- The start time will be recorded on the clocking.
The clockings can be viewed in the
Clockings tab.
- The operation will be marked with a monkey wrench symbol to
the left in the operation list. If several operations was started together
in sequence the monkey wrench will be complemented with a chain link.
- If the operation had an exclamation mark for
interruption, this symbol is now removed.
- The status of the operation is set to Setup Started.
- If the employee or team is running an indirect job, this will be
stopped.
- If the work center resource has an ongoing downtime clocking, this will be
stopped.
- If a machine operation clocking is already running on the resource where this one
is started and the Concurrent Operations field
in the
Work Center window is set to Not Allowed, this machine clocking will be
stopped.
- The selected resource will be set as the preferred resource for the
operation.
- If multiple operations were selected and started
simultaneously they will either be started in sequence (share the same
clocking sequence), or in parallel (individual clocking sequences) depending
on the Concurrent Operations value in the Work Center
window.
- If multiple operations are started in parallel and the site has been
configured to report labor anonymously, the value in the Crew Size
field will be distributed among the generated labor clockings based on the
planned crew size of the operations.
Window
Shop Floor Workbench
Time Clock
Related Window Descriptions
Shop Floor Workbench
Start Setup
Time Clock
Time Clock Data Input Dialog
Procedure
From the Shop Floor Workbench window:
- Open the Shop Floor Workbench window. If Reporting Mode
has been set to Employee Reporting on the used site an employee or
team must have been entered in the Enter As dialog box.
- Click Refresh. The operations will be displayed according to the
filter that is being used.
- Select the operation lines for which you wish to
start setup, and click Start Setup.
- The
Start Setup dialog box will be
opened. Based on the data entered in the
Shop Order window,
Machine Time and Labor Time options will be selected. You
can change the values if you want to.
- Choose the resource which on the operation will be set up in the
Resource list.
- If run in Employee Reporting mode, enter the employees that will
work with the operation in the Employee table. If a team is entered in
Shop Floor Workbench, the employees currently in the team is displayed and may not
be changed. If run in Anonymous
mode, enter the crew size manually.
- Click OK. The start time can be viewed in the Clockings
tab.
From the Time Clock window:
- Click the Start Setup button in Time
Clock.
- Enter the Site to report on.
- Enter the Employee ID or the Team.
- Enter the Operation ID you want to start
setup for.
- If machine setup time exists for the operation, Machine Time will be automatically set to
Yes. Set it to No
if you do not want to start machine setup.
- Choose the resource on which the operation will be set up in the Resource ID.
- If the existing clockings for the employee should
be stopped, select Yes in Stop Emp Clockings. The default
value is set based on the value of Allow Concurrent Operations for
the employee in Shop Floor Employee window.
- Click OK.
Note: Depending on the Time Clock
configuration, some of these fields may be automatically filled with default
data and thereby the fields may be disabled or unavailable for editing.