Perform Report Point Scrap

Explanation

This activity is used to declare report point scrap that occurred on the produced parts during the manufacturing process. Note: Labor and operation setup time for each receipt is calculated as [(setup time/standard lot size)*receipt quantity] If standard lot size is not defined, then the total setup time will be reported for every receipt.

Prerequisites

System Effects

Window

Report Point Receipt
Production Receipt
Production Schedule by Line
Production Schedule by Line Part

Production Line Management 

Related Window Descriptions

Report Point Receipt
Production Receipt  
Production Schedule by Line

Production Schedule by Line Part

Production Line Management
Production Line Management/Current Production Schedule
Scrap Receipt

Procedure

From the Report Point Receipt/Production Receipt window:

  1. Open the Production Receipt window.
  2. In the Production Line list, select the production line and part for which to report scrap.
  3. Right-click and then click Scrap Receipt. The Scrap Receipt dialog box appears.
  4. In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
  5. In the Structure area, specify the structure revision and structure alternate. If desired, also specify the routing revision and the routing alternate.
  6. In the Production Scrap area, type the quantity scrapped in the Qty Scrapped field. Click in the Scrap Reasons field, then click List to select from available scrap reasons.
  7. In the Report Point area, select the Partial Scrap check box to declare a partial scrap at a report point.
  8. In the Report Point area, specify the report point in the Report Point ID field. Click List to select from available report points.
  9. Click OK.

From the Production Schedule by Line or Production Line Management/Current Production Schedule window:

  1. Search for the production line for which you want to report scrap.
  2. Select the production schedule line for which you want to report scrap. Right-click and then click Scrap Receipt. The Scrap Receipt dialog box appears.
  3. In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
  4. In the Structure area, specify the structure revision and structure alternate. If desired, also specify the routing revision and the routing alternate.
  5. In the Production Scrap area, type the quantity scrapped in the Qty Scrapped field. Click in the Scrap Reasons field, then click List to select from available scrap reasons.
  6. In the Report Point area, select the Partial Scrap check box to declare a partial scrap at a report point.
  7. In the Report Point area, specify the report point in the Report Point ID field. Click List to select from available report points.
  8. Click OK.

From the Production Schedule by Line Part window:

  1. Search for the part for which you want to report scrap.
  2. Select the production schedule for which you want to report scrap. Right-click and then select Scrap Receipt. The Scrap Receipt dialog box appears.
  3. In the Scrap Receipt window, select the Receipt in Background check box to execute the receipt in the background.
  4. In the Structure area, specify the structure revision and structure alternate. If desired, also specify the routing revision and the routing alternate.
  5. In the Production Scrap area, type the quantity scrapped in the Qty Scrapped field. Click in the Scrap Reasons field, then click List to select from available scrap reasons.
  6. In the Report Point area, select the Partial Scrap check box to declare a partial scrap at a report point.
  7. In the Report Point area, specify the report point in the Report Point ID field. Click List to select from available report points.
  8. Click OK.