Use this activity to enter an indirect job. Indirect jobs can be used to report labor time that cannot be reported on a shop order operations like cleaning or maintenance. Similar to the shop order operations, time on an indirect job is reported on a team or an employee from Shop Floor Workbench window.
N/A
A new indirect job is created on the specified site.
Note: If you do not want to use the indirect job for a period of time, the status can be set to Blocked or Hidden using the right mouse button option.