This activity is used to calculate the labor capacity for the labor classes on a site. The calculation for each labor class is based on individuals or groups.
The calculation can also include a capacity calculation for manufacturing qualifications. You can perform the calculation for one site at a time or for all the sites to which you have access. You can also schedule this as a scheduled task. The calculation is done from the date of initiation to the date specified in the Calculation to Date field. When there is no date specified in the Calculation to Date field, the last date that an operation is scheduled with a labor requirement is considered as the calculation to date.
To perform this activity, you will need to have at least one person or group resource quantities connected to a labor class on the site and that resource needs to be available for at least one day in the time interval.
Persons with any of the following prerequisites will not get any capacity:
As a result of this activity, the available and theoretical man hours for labor class and each qualification profile stored in the database for each day is updated. The stored data will later be used to generate the Employee Qualification Demand Graph window as well as the available and theoretical capacity for manufacturing labor class.
Calculate Labor Capacity for Manufacturing
Manufacturing Labor Class
Manufacturing Labor Classes
Calculate Labor Capacity
for Manufacturing
Manufacturing Labor Class
Manufacturing Labor Classes
You can perform the capacity calculation either as a background job executed once (Procedure A) or by scheduling the task to execute as a background job at a specified time or on a (Procedure B).
Procedure A:
Procedure B:
Note: Scheduled tasks can be seen in the Scheduled Database Tasks window.
The Calculate
Labor Capacity for Manufacturing dialog
box can be opened by right-clicking the header of the Manufacturing Labor Class
window.