This activity is used to analyze the worst case labor availability on a high level for a labor class, work center, department or production line using a pie chart.
To populate the chart, click the magnifying glass and search either for relevant shop orders, or labor classes/time period depending on the page used. When searching for shop orders, chart will show the labor classes connected to any of the operations on those shop orders.
A pie segment represents either a labor class, work center, department or production line depending on the selected group by option and is assigned a load category based on below logic:
Load Category | Labor Class | Work Center | Department | Production Line |
Not Loaded | The labor class has capacity, but no workload. | None of the labor classes required to perform work on the work center have any workload. | None of the labor classes required to perform work on any work center connected to the department have any work load. | None of the labor classes required to perform work on any work center connected to the production line have any work load. |
Partially Loaded | The labor class has workload less than its capacity for all days/weeks. | All of the labor classes required to perform work on the work center have workload less than its capacity for all days/weeks. | All of the labor classes required to perform work on any work center connected to the department have workload less than its capacity for all days/weeks. | All of the labor classes required to perform work on any work center connected to the production line have workload less than its capacity for all days/weeks. |
Fully Loaded | The labor class has workload that equals its capacity on at least one day/week. | At least one of the labor classes required to perform work on the work center has workload that equals its capacity on at least one day/week. | At least one of the labor classes required to perform work on any work center connected to the department has workload that equals its capacity on at least one day/week. | At least one of the labor classes required to perform work on any work center connected to the production line has workload that equals its capacity on at least one day/week. |
Overloaded | The labor class workload exceeds its capacity on at least one day/week. | At least one of the labor classes required to perform work on the work center has workload that exceeds its capacity on at least one day/week. | At least one of the labor classes required to perform work on any work center connected to the department has workload that exceeds its capacity on at least one day/week. | At least one of the labor classes required to perform work on any work center connected to the production linehas workload that exceeds its capacity on at least one day/week. |
The chart can be configured using below settings:
To limit the contents of this chart based on a selection made in another chart, open the settings dialog by clicking the gearwheel icon and select to filter from below chart:
This activity can be performed from IFS Aurena client only.
N/A