Enter Material Requisition Line
Explanation
The material requisition is built in two levels, consisting of a requisition header and
one or more requisition lines. The second step in a new entry is to enter material
requisition lines.
For condition code enabled parts, you can specify a condition code in the Condition
Code field. The supply code of the inventory part is entered in the Default Mtr Req
Supply field on the Inventory Part/Acquisition tab.
You can alter between inventory order and purchase order. The supply code
indicates whether the part will be issued from inventory or a requisition should
be created to purchase the part. However, you can make a single occurrence
change on the order line by using the Supply Code list.
Prerequisites
- A material requisition header must have been entered and saved.
- The inventory part must have been entered and saved or a non-inventory purchase part must have been entered
with a supplier for purchase part record.
- If you want to specify a condition code, this must have been enabled on the
record, in the Part
Catalog window. This can be used only for lot batch
and/or serial-tracked parts.
- If you want to perform Next Level Demand planning,
the following types of parts must have been created:
- Purchase Part - The planned part is purchased.
- Manufacturing Structures - The planned part is manufactured.
- Supplier Parts - The planned part is sourced from a supplier split.
- Make/Buy Splits - The planned part is both purchased and manufactured.
System Effects
- As result of this entry, a material requisition line in the Released status
will be created. A
purchase requisition will be created if Purchase Order is used as supply code.
- If you perform Next Level Demand planning, a single level material plan
will be created. The
part planned will be sourced using make/buy splits and supplier part information
to determine the order proposals. If the net
requirement is for a part that is sourced from a multi-site planned internal
supplier, then a distribution order will be created. If
the part is sourced from a make/buy split with supplier splits,
this process would result in the creation
of a combination of outputs in the form of shop requisitions, distribution
orders, and purchase requisitions. Otherwise, the Inventory Part type and
the Inventory Part Supply type will determine what kind of requisition or order
is to
be created.
Window
Material Requisition
Related Window Descriptions
Material Requisition
Procedure
- Click in the lower part of the Material Requisition window, and then
click New.
- Either enter the part number of the part to be issued in the Part No
field or indicate
it by using the List of Values.
- If you need to specify a condition code for the part, use the List of
Values in the Condition Code field to select from among available
values.
- Specify the quantity needed in the Qty Due field.
- You can save the requisition line now if you do not need to change any default values.
(Continue to step 7.)
- The supply code can either be Inventory Order or Purchase Order. The supply code indicates whether the part will be issued from
inventory or a requisition should be created to purchase the part. If you select Purchase
Order, you can view the purchase information by marking the
line and selecting the Purchase Information in the Operations menu.
Note: If you intend to connect the material
requisition line to a project activity, first set the supply code to
Inventory Order, and then connect the line to a project activity. Upon
connecting, the supply code will be changed to Project Inventory; if
required, you can change it back to Inventory Order.
If you have connected the line to a project activity and set the supply code
to Project Inventory, parts can be issued only from the project inventory of the
connected project. If you set the supply code to Inventory
Order, parts can be issued from standard inventory on behalf of the
connected project activity.
- Save when completed.