Calculate Interim Demand Cost

Explanation

Use this activity to calculate the costs for a selected cost set of an interim demand header.

Prerequisites

System Effects

Window

Interim Demand Header
Interim Demands
Interim Order

Related Window Descriptions

Interim Demand Header
Interim Demands
Interim Order
Interim Order/Costs

Procedure

  1. Open the Interim Demand Header window.
  2. Query for the interim demand header for which you want to calculate costs.
  3. Right-click anywhere in the header, then click Calculate Cost. The Calculate Cost dialog box is opened.
  4. Enter the cost set for which the calculation should be performed in the Cost Set field. Use the List to select a suitable value.
  5. Click OK.
  6. To set the costs for the configuration when the inventory value is defined as Cost per Configuration, right-click anywhere in the header, then click Save Standard Cost.
  7. Costs can be viewed in the Interim Order/Costs tab, Interim Demand Header/Tree Structure/Costs tab and in the Interim Order Costs window.

Note: This activity can also be performed in the Interim Demands window.