Connect or Modify Control Measures
Explanation
This activity is used to link predefined control measures to the hazard.
Prerequisites
There are no prerequisites.
System Effects
There are no system effects.
Window
Risk
Assessment
Related Window Descriptions
Risk Assessment
Procedure
- Open the Risk Assessment window.
- Search or populate to find the required risk assessment.
- In the Hazard navigator, select a hazard ID. The
Risk Control
Measures tab will be enabled.
- Go to the Risk Control Measures tab and create a new record.
- Specify the control measure and the description of the control measure
and time frames in the respective fields.
- Save the information.