Add Standard Operation

Explanation

Use this activity to copy standard operations. It is only possible to copy the standard operation information for estimate, not referred as for routings. Copy is the only option since reference would provide the possibility to influence the estimate cost calculation by updating the standard operation parameters. Changes of the operation parameters which have an impact on the cost calculation is only allowed from the estimate operation record itself.

Prerequisites

This activity requires that:

System Effects

This action copies a standard operation to the list of operations for the selected item.

Window

Estimate

Related Window Descriptions

Estimate/Estimate Items/Product

Procedure

  1. Open the Estimate window and query for the required Estimate ID.
  2. Click on the first on Estimate Items/Product tab
  3. Right-click from the top object in the tree structure and select Expand Descendents.
  4. Select the sub-item in the tree structure which is connected to the reference item type product.
  5. Click on the Items/Product/Operations tab.
  6. Right click and select Add Standard Operation.
  7. In the Add Standard Operation dialog enter an operation number, either enter or use the list of value to select a standard operation.
  8. Press OK