Define Critical Work

Explanation

Use this activity to create a definition for critical work. Critical work is a definition of how different combinations of the parameters work type, object criticality and work order priority should mark work orders or PM actions as critical work or not. If IFS/Maintenance Planning Board (MPB) is used, the critical work value on the work order can then be used as a parameter when scheduling work orders/PM action occurrences with maintenance planning board. When creating a line for critical work, at least one of the three parameters (work type, object criticality and work order priority) needs to be set. A check box on each line called "critical work" needs to be checked for the combination of parameters to be considered as critical work.

Prerequisites

N/A

System Effects

Window

Work Order and PM Basic Data

Related Window Descriptions

Work order and PM Basic Data
Work order and PM Basic Data/Critical Work

Procedure

  1. Open the Work Order and PM Basic Data window and click the Critical Work tab.
  2. Create a new record (F5).
  3. Enter the company that the line should be valid for.
  4. Enter the work type that the line should be valid for.
  5. In the primary criteria field chose what should be the primary criteria for this line. Either work order priority or object criticality. For not having any of the two criteria's a "none" value can be chosen.
  6. Enter a value for what is chosen as the primary criteria.
  7. In the secondary criteria field chose what should be the secondary criteria for this line. Either work order priority or object criticality. For not having any second criteria a "none" value can be chosen.
  8. Enter a value for what is chosen as the secondary criteria.
  9. Check the critical work check box if this line is to be considered as critical.
  10. Save the information (F12).