Cost Bucket/Bucket of Elements

[About Costing Basic Data]

[To Costing]

Usage

Use this tab to define the cost elements to be connected to the cost bucket. This tab is available only if the bucket type is Bucket of Elements. This bucket type is the standard type, i.e., it is used within the predefined buckets at system startup.

Activity Diagrams

Set up costing basic data

Activities

Assign cost element to cost bucket