Update Design Object Planned Cost from ERMPL

Explanation

This activity is used to enable the update of the costs and cost elements of the design object from the engineering register material procurement list (ERMPL).

Prerequisites

System Effects

Window

Project Navigator
Project

Activity
ERMPL

Project Connections

Related Window Descriptions

Project Connections
ERMPL

Procedure

Note: Right-click on a part line in the ERMPL window/tab and select the Cost Elements option to make a change to the planned cost for the demand registered in that window/tab.

Use the following procedure to update the design object planned cost from ERMPL on the Project Connections window:

  1. Open the Project Connections window.
  2. Search for the design object for which you want to update planned costs from ERMPL.
  3. Observe that the Cost Updated from ERMPL check box is cleared, indicating that the Total Planned Cost of the design object has not been updated from ERMPL, based on the total planned cost of the additional parts of the design object.
  4. Right-click and click Update Planned Cost from ERMPL. The Cost Updated from ERMPL check box will have been selected. The value in the Total Planned Cost field for the Design Object in the Project Connections window will reflect the changes to the planned cost that you just entered in the ERMPL window/tab.

Use the following procedure to update the design object planned cost from the ERMPL window/tab:

  1. Open the Project Navigator or the Project window, and search for the respective project. Alternatively on the Activity window, search for the required activity. Click on the Demand/ERMPL tab. Alternatively, simply open the ERMPL window.
  2. Select a demand line, right-click and click Update Design Object Planned Cost.
  3. Observe that the Design Obj. CE Updated check box on this window/tab and the Cost Elements Updated from ERMPL field in the Project Connections window will be selected, indicating that the Total Planned Cost for the parts in the design object has been updated from the ERMPL. The value in the Total Planned Cost field for the Design Object in the Project Connections window will reflect the changes to the planned cost that you just entered in the ERMPL window/tab as well.